Nifty 200 Momentum 30 Index aims to track the performance of the top 30 companies within the Nifty 200 selected based on their Normalised Momentum Score.
Unlock exclusive stocks’ data & unlimited access with Tickertape Pro
NTPC Limited has informed the Exchange regarding 'Declaration of COD of fifth and last part capacity of 50 MW of 300 MW Nokhra Solar PV Project of NTPC Green Energy Limited (A wholly owned Subsidiary of NTPC Limited) '.Consequent upon successful commissioning, fifth and last part capacity of 50 MW of 300 MW Nokhra Solar PV Project of NTPC Green Energy Limited (A wholly owned Subsidiary of NTPC Limited) at Bikaner, Rajasthan, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 03.06.2023. The first part capacity of 100 MW has already been declared on commercial operation w.e.f. 20.12.2022, second part capacity of 50 MW w.e.f. 30.12.2022, third part capacity of 50 MW w.e.f. 16.02.2023 and fourth part capacity of 50 MW w.e.f. 01.04.2023.With this, installed and commercial capacity of NTPC Green Energy Limited will become 2711 MW while group installed and commercial capacity of NTPC will become 72354 MW. | Download
NTPC Limited has informed the Exchange regarding 'Declaration of COD of fifth and last part capacity of 50 MW of 300 MW Nokhra Solar PV Project of NTPC Green Energy Limited (A wholly owned Subsidiary of NTPC Limited) '.Consequent upon successful commissioning, fifth and last part capacity of 50 MW of 300 MW Nokhra Solar PV Project of NTPC Green Energy Limited (A wholly owned Subsidiary of NTPC Limited) at Bikaner, Rajasthan, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 03.06.2023. The first part capacity of 100 MW has already been declared on commercial operation w.e.f. 20.12.2022, second part capacity of 50 MW w.e.f. 30.12.2022, third part capacity of 50 MW w.e.f. 16.02.2023 and fourth part capacity of 50 MW w.e.f. 01.04.2023.With this, installed and commercial capacity of NTPC Green Energy Limited will become 2711 MW while group installed and commercial capacity of NTPC will become 72354 MW. | Download
Final • Div/Share: ₹ 11.3